New Road Costs increase by £60m

The new Western Distributor Road from the M55 to Blackpool Road was originally around £100m but has now increased to £160m.   This is due to two long viaducts being needed and that the original estimate was done without design or survey.Preston Western Distrutor Road 2018

 

This entry was posted in Uncategorized. Bookmark the permalink.